2007 2008 İSDEMİR FACTORY NO:1 SLAB CASTING PLANT/ İSKENDERUN, TURKEY
SLAB TURNER HYDRAULIC SYSTEM 
Within the scope of this project;  mechanical fabrication/ installation, hydraulic, automation works with total weight of 50 ton were completed. 
2005 2007 İSDEMİR BOF CAPACITY IMPROVEMENTIN AND MODERNIZATION / İSKENDERUN, TURKEY
HOT METAL LADLE AND TEEMING LADLE FABRICATION 
Bu proje kapsamında, toplam 1190 ton P355NH malzeme 8 adet Sıcak Metal Potası ve 24 adet Döküm Potası imalatı tamamlanmıştır. 
Within the scope of this project,  8 units of  P355NH hot metal ladle and 24 units of P355NH teeming ladles with total weight of 1190 ton were fabricated.
2005 2006 İSDEMİR BOF CAPACITY IMPROVEMENTIN AND MODERNIZATION / İSKENDERUN, TURKEY
CONVERTER LOWER PARTS
Within the scope of this project, converter lower parts with total weight of 140 ton were fabricated.