CIVIL PROJECTS
Commencement | Completion | Project Name | Scope of the Project |
---|---|---|---|
2013 | 2014 |
LUSAIL MULTIPURPOSE HALL/ DOHA, QATAR |
Within the scope of this project, 4.075 ton of steel erection and 43.554 WDI pipe welding were completed. |
2010 | 2012 |
ASAB MAIN OIL LINE/ ABU DHABI, UAE |
Within the scope of this project, 10.000 ton of steel erection was completed. |
2008 | 2010 | NEW DOHA INTERNATIONAL AIRPORT AIRCRAFT MAINTENANCE HANGAR/ DOHA,QATAR AIRCRAFT MAINTENANCE HANGAR STEEL ERECTION WORKS |
Within the scope of this project, approximately 22.000 ton of steel erection was completed. |
2006 | 2007 | INDUSTRIAL DEVELOPMET BANK OF TURKEY GENERAL MANAGEMENT II. BUILDING/ İSTANBUL, TURKEY STRUCTURAL REINFORCEMENT |
Within the scope of this project, concrete columns and beams are reinforced by steel structures to resist earthquake forces. Approximately total weight of 70 ton of steel structure fabrication and erection works were completed. |
2005 | 2006 | INDUSTRIAL DEVELOPMET BANK OF TURKEY GENERAL MANAGEMENT BUILDING/ İSTANBUL, TURKEY STRUCTURAL REINFORCEMENT |
Within the scope of this project, concrete columns and beams are reinforced by steel structures to resist earthquake forces. Approximately total weight of 100 ton of steel structure fabrication and erection works were completed. |
2004 | 2006 |
GÜMÜŞOVA- GEREDE SECTION 2 BOLU MOUNTAIN CROSSING VIADUCT INSTALLATION/ BOLU, TURKEY |
Within the scope of this project, total weight of 16.500 ton and 2000 meters long steel viaduct erection was completed. |
2000 | 2001 |
İSTANBUL ATATÜRK OLYMPIC STADIUM/ İSTANBUL, TURKEY |
Within the scope of this project, 3460 ton steel and 637 ton steel ladder erection were completed. |