PIPE SPOOL FABRICATION 

Commencement Completion Project Name Scope of the Project
2013 2014 TÜPRAŞ RUP PROJECT/ KOCAELİ, TURKEY
PIPE SPOOL FABRICATION
Within the scope of this project, 114,000 WDI carbon steel pipe spools were fabricated.
2013 2014 ERZIN COMBINED CYCLE POWER PLANT/ HATAY, TURKEY
BORU SPOOL İMALATLARI
Within the scope of this project, total of 49.000 WDI pipe spools comprising of 39.000WDI carbon steel, 6.000WDI stainless steel and 4.000 WDI P91 grade alloy steel were fabricated.
2011 2011 LUHAIS & SUBBA OIL FIELD/ IRAQ
MANİFOLD FABRICATION
Within the scope of this project, 100 ton of manifolds were fabricated to be used at Luhais and Sabba Oil Field.
2011 2011 PHOSPHORIC ACID PLANT/ ESHIDIYA, JORDAN
ATTACK & DIGESTION VESSEL EMBEDDED PARTS FABRICATION
Within the scope of this project, 91 pieces of various nozzles, total of 20 ton were fabricated.
2009 2010 BANDIRMA NATURAL GAS COMBINED CYCLE PLANT PART 3, 5/ BANDIRMA, TURKEY
PIPE SPOOL FABRICATION
Within the scope of this project, pre- fabrication of pipes were completed with ASME B31.1 (S-Stamp) and according to ASME B31.3 standards to be used for low pressure steam systems and closed cycle cooling liquid systems.
2009 2010 BANDIRMA NATURAL GAS COMBINED CYCLE PLANT/ BANDIRMA, TURKEY
HRH / IP VE LP STEAM SYSTEMS PRELIMINARY PIPE FABRICATION
Within the scope of this project, pre-fabrication of pipes with S-Stamp were completed in accordance with ASME B31.1 standards to be used for natural gas cycle plant HRH/IP and LP steam systems.
2008 2008 KHURAIS WATER INJECTION PLANT/ SAUDI ARABIA
PIPE SPOOL FABRICATION
Within the scope of this project, total of 70,000 WDI pipe spools were fabricated.
2006 2008 KASHAGAN POWER PLANT/ KAZAKHSTAN
PIPE SPOOL FABRICATION
Within the scope of this project, total of 270,000 WDI pipe spools were fabricated.