PIPE SPOOL FABRICATION
Commencement | Completion | Project Name | Scope of the Project |
---|---|---|---|
2013 | 2014 | TÜPRAŞ RUP PROJECT/ KOCAELİ, TURKEY PIPE SPOOL FABRICATION |
Within the scope of this project, 114,000 WDI carbon steel pipe spools were fabricated. |
2013 | 2014 | ERZIN COMBINED CYCLE POWER PLANT/ HATAY, TURKEY BORU SPOOL İMALATLARI |
Within the scope of this project, total of 49.000 WDI pipe spools comprising of 39.000WDI carbon steel, 6.000WDI stainless steel and 4.000 WDI P91 grade alloy steel were fabricated. |
2011 | 2011 | LUHAIS & SUBBA OIL FIELD/ IRAQ MANİFOLD FABRICATION |
Within the scope of this project, 100 ton of manifolds were fabricated to be used at Luhais and Sabba Oil Field. |
2011 | 2011 | PHOSPHORIC ACID PLANT/ ESHIDIYA, JORDAN ATTACK & DIGESTION VESSEL EMBEDDED PARTS FABRICATION |
Within the scope of this project, 91 pieces of various nozzles, total of 20 ton were fabricated. |
2009 | 2010 | BANDIRMA NATURAL GAS COMBINED CYCLE PLANT PART 3, 5/ BANDIRMA, TURKEY PIPE SPOOL FABRICATION |
Within the scope of this project, pre- fabrication of pipes were completed with ASME B31.1 (S-Stamp) and according to ASME B31.3 standards to be used for low pressure steam systems and closed cycle cooling liquid systems. |
2009 | 2010 | BANDIRMA NATURAL GAS COMBINED CYCLE PLANT/ BANDIRMA, TURKEY HRH / IP VE LP STEAM SYSTEMS PRELIMINARY PIPE FABRICATION |
Within the scope of this project, pre-fabrication of pipes with S-Stamp were completed in accordance with ASME B31.1 standards to be used for natural gas cycle plant HRH/IP and LP steam systems. |
2008 | 2008 | KHURAIS WATER INJECTION PLANT/ SAUDI ARABIA PIPE SPOOL FABRICATION |
Within the scope of this project, total of 70,000 WDI pipe spools were fabricated. |
2006 | 2008 | KASHAGAN POWER PLANT/ KAZAKHSTAN PIPE SPOOL FABRICATION |
Within the scope of this project, total of 270,000 WDI pipe spools were fabricated. |